Play

Next Project

The Very Group 2024 078 1

The Very Group

Loading & Unloading Canopy

Onward Distribution Facility
25m x 30m x 6m
Wrexham, North Wales
Neivalu Neivalu

Onward Distribution Building – Loading & Unloading Canopy

The Very Group modified their Spaciotempo loading canopy by adding front and rear cladding for enhanced weather protection. Discover how this flexible solution improved their logistics efficiency.
very case study 

The Very Group Logo wine
The Very Group 2024 145

Requirements

The Very Group needed a demountable temporary building to support their loading and unloading processes. Initially installed as an open-sided canopy, the structure needed to be upgraded with cladding on the front and rear to prevent wind and rain from affecting operations. These modifications were necessary to prepare for unpredictable weather conditions while maintaining the flexibility of a temporary solution.  
 

The Very Group 2024 168
The Very Group 2024 003
The Very Group 2024 162

Spaciotempo’s loading canopy at The Very Group’s Wrexham site, enhancing logistics efficiency.

The front of the canopy modified with cladding and three new apertures for transport access.

Rear modifications included a fully cladded gable triangle for added weather protection.

The solution

The Very Group initially opted to hire a temporary canopy from Spaciotempo in June 2023 as a short-term solution for their transport and distribution needs. With Spaciotempo’s flexible pricing structure, they were able to extend their hire contract seamlessly. This adaptability made it easier for them to modify their existing structure rather than invest in a permanent build. 

(01)

Enhanced Weather Protection with Cladding

The Very Group 2024 152

As their requirements evolved, The Very Group decided to enclose the open ends of the structure to prevent wind and rain from disrupting loading operations. The modifications included a fully cladded gable end at the front, creating three new apertures for inward transport movement. At the rear, a hard gable triangle was installed, providing additional weather resistance.  
 

(02)

Quick and Efficient Installation

The Very Group 2024 124

Spaciotempo’s expert team carried out the modifications with minimal disruption to The Very Group’s operations. The front of the canopy was upgraded with 5m separated baseplates for structural support, followed by a framework of interconnecting beams and cladding. At the rear, specially cut dwarf uprights and diagonal brace bars were installed to reinforce the structure before adding the final cladding. The entire transformation was completed within just four days.  
 

“The ability to modify and extend our temporary canopy has been invaluable for our operations. Spaciotempo’s flexibility allowed us to adapt quickly to changing requirements, ensuring our logistics run smoothly in all weather conditions.”  

"Spaciotempo has provided a robust and adaptable solution that perfectly aligns with our evolving business needs."

The Very Group

Temporary buildings. 
Lasting solutions.

Be it lack of storage or warehouse space, production or maintenance facilities, or cover for your loading and unloading operations, our structures meet every requirement.

Industrial brochure

PDF download

Get a quote

Online form

Associated British Ports

Permanent Storage & Distribution Hub

Next
Project

Kickstart your build today.

Don’t let space limitations hold back your business growth. Start your project now!

Get a quote

Temporary buildings brochure

Our brochure places a firm focus on your industry. Download for an insight into our capability and to view past examples of projects we’ve delivered.

Temporary buildings FAQs

Understand everything there is to know about temporary buildings, from planning requirements to aftercare.