OTR Solidboss Worldwide UK Ltd
Semi-Permanent Workshop & Storage Depot
A versatile workshop & storage depot to take advantage of underutilised site space
OTR Solidboss Worldwide UK Ltd are a global leader in the design and manufacture of tyres, wheels and rubber tracks and they are consistently busy supplying their solutions to a number of sectors, ranging from industrial settings to agriculture and even sports.


Requirements
At their Stowmarket site in Suffolk, OTR Solidboss manufacture, repair and foam-fill their tyres for Original Equipment Manufacturer (OEM) customers but quickly found themselves running out of true, up-to-standard covered warehouse and workshop space.
In step Spaciotempo.
The solution
After little deliberation on service and quality, Spaciotempo got to work on the 12m x 37m x 5m installation, with the non-standard length maximising all available site space in tight surroundings. In the short-term it will be used for storage, but as it was purchased it has all the versatility to be deployed as a workshop or even something completely different in the future.
(01)
Working to tight spaces

As the space we had to work with was so tight – with our structure to erected in the midst of multiple existing buildings – the covered warehouse and workshop had to be exactly flush in the pre-agreed spot down to the millimetre and we were given landmarks to indicate the exact position.
Thankfully, with our installation techniques, we only require 1m of operational space around the perimeter of the frame, so this didn’t prove to be a problem.

(02)
Minimal disruption

What’s more, Spaciotempo were briefed that they would be working around the operations of the company so not to disrupt production as best as possible.
Harry Salter, Area Sales Manager for Spaciotempo, explains:
“Being a live site, with lots of activity and forklifts in operation at all times, the Spaciotempo team had to be mindful of the impact they were having during the installation and did an excellent job in keeping the required space for our own men and machinery to an absolute minimum.
Client feedback
OTR SolidBoss Worldwide UK Ltd Managing Director Mark Duncan already has that rock-solid relationship with our Area Sales manager Harry Salter from the rapport they developed in finding the perfect size covered warehouse and workshop.
But he was equally impressed with the 4-man installation crew we sent to erect the building too – an installation that took just 9 days in October 2024.
He said:
"What a great team you sent to me to erect the warehouse, you should be very proud. Professional and polite - I really cannot say in words how superb they were.
Spaciotempo should be very proud to have these guys represent your company to your customers. OUTSTANDING!"
Mark Duncan, OTR Solidboss Worldwide UK Ltd
Temporary buildings.
Lasting solutions.
Be it lack of storage or warehouse space, production or maintenance facilities, or cover for your loading and unloading operations, our structures meet every requirement.